< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=318636409624663&ev=PageView&noscript=1" />
Home
About
Products
Application
Exhibition & news
VIDEO
CONTACT
English
English Spanish

Do you know what preparations to do to install Solar Studs?

Date:2022-05-12
What preparations should be done to install Solar Studs? Ruichen will introduce to you, the main contents are as follows:
1. Under the condition of ensuring the light performance, it is necessary to appropriately increase the spacing of solar-powered Solar Studs lamps to save the number of lamps, and appropriately increase the height of solar-powered Solar Studs to improve the lighting effect; as far as possible, separate the poles in the middle of the road to save Project costs.

2. Comprehensively understand the characteristics of solar Solar Studs, light sources, and lighting standards based on the actual road and reference, combined with the investment budget, and reasonably select solar Solar Studs, light sources, and light poles to give full play to the high efficiency and energy saving of the light source. The advantages of light distribution and accessories combination.
3. Combined with road engineering, timely and early intervention in Solar Studs selection, foundation construction and pre-embedding, in order to find problems in time, make reasonable changes, ensure quality and save investment.

4. According to the actual and geological conditions of the solar Solar Studs project site, design and manufacture the solar Solar Studs foundation and the high pole light foundation to ensure that the foundation is firm and reliable. Special attention should be paid to the fitting of the pre-embedded bolts with the reserved holes of the rod seat, the accurate positioning, the reasonable pre-embedded length of Solar Studs and the external retention length, and the threaded part should be properly protected to facilitate hoisting and positioning.

5. In rock strata and weathered stone areas, it is difficult to meet the requirements of scattered grounding and segmented grounding. It can be considered to connect conductors such as galvanized flat steel according to the design requirements. The foundation is reliably connected to ensure that each light pole is reliably connected to the ground. The mid-to-high pole lights of Solar Studs are scattered and mainly rely on basic grounding. When necessary, a resistance reducing agent should be used to reduce the grounding resistance.
Copyright © Henan Ruichen Traffic Equipment Co., LTD All Rights Reserved
   Privacy Policy    Technical Support :coverweb
whatsapp
Phone
Email