Glue:
Mixing glue, epoxy resin, glue curing agent, and cement are very viscous after proportioning, especially in winter, it is difficult to mix and move manually. exert its curing effect.
Using glue, apply the glue to the road surface and press the
Road Studs firmly. The dosage must be reasonable, too little, the
Road Studs will not be pressed firmly; too much, the glue will be wasted and the reflector will be easily stained.
Road closure:
Epoxy glue can only cure after 6 hours, so it has to be closed for 6 hours.
Road Studs special attention to the problem:
1) The drilling is too shallow, and the bottom surface of the
Road Studs cannot be fully contacted with the ground, which affects its firmness. Therefore, the drilling depth must follow the principle of nail foot + 1 cm.
2) The holes are too thin, and the nail feet are difficult to install. Therefore, you must choose a reasonable drill bit for drilling.
3) Install
Road Studs without removing the ash generated during the drilling process. As a result, the
Road Studs are not firmly glued and fall off easily.
It can be seen that choosing a smooth and clean road surface, choosing the appropriate glue, sufficient and uniform glue, and closing the road for 6 hours are the major steps that should be paid attention to in the installation of
Road Studs.