< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=318636409624663&ev=PageView&noscript=1" />
Home
About
Products
Application
Exhibition & news
VIDEO
CONTACT
English
English Spanish

Will you better install solar road studs?

Date:2021-12-02
Method one:
    1. Placing and installing safety isolation facilities is the most important aspect of installing Solar Road Studs. During the entire dynamic construction process, no matter whether it is a new road or an open road, everyone should be in safety facilities, such as For construction in open roads, the ratio of safety personnel to installation personnel should be 1:1. For construction on unopened sections, the ratio of safety personnel to installation personnel should be 1:3.
    2. Determine the installation position of Solar Road Studs, and ensure that the installation position of Solar Road Studs is level. For roads with expansion, cracks and unevenness, the roads should be smoothed and leveled in advance.

    3. Clean the installation location of Solar Road Studs with a brush, and make sure that the installation location is dry.
    4. Take an appropriate amount of glue and apply it on the road stud evenly.
    5. Firmly press the Solar Studs on the installation position, make sure the direction is correct, if there is too much glue, be sure to clean it up;
  6. If it is a cast aluminum Solar Studs with feet, make sure that the depth of the hole is greater than the depth of the nail foot by 1cm, and the diameter of the hole is greater than the diameter of the nail foot by 2mm.

  7. A tour should be done within two hours after the installation of Solar Studs to ensure that all Solar Studs are not installed upside down, installed crookedly or crooked.
    8. After 4 hours of curing, remove and install isolation facilities.
  Method Two:

    1. Placing Solar Studs to install safety isolation facilities is a very important point. I hope that everyone will not ignore it. In the entire dynamic construction process, whether it is a new road or an open road, everyone should be in safety facilities. In the case of construction on traffic roads, the ratio of safety personnel to installation personnel should be 1:1. For construction on unopened sections, the ratio of safety personnel to installation personnel should be 1:3.
  2. Determine the installation position of Solar Studs and ensure that the installation position of Solar Studs is level. For roads with expansion, cracks and unevenness, the roads should be smoothed and leveled in advance.
3. Use an impact drill to drill two holes on the road surface that match the ear holes of the Solar Studs.
Copyright © Henan Ruichen Traffic Equipment Co., LTD All Rights Reserved
   Privacy Policy    Technical Support :coverweb
whatsapp
Phone
Email