First, use a ruler to determine the installation position of the Road Studs, install a Road Studs at 15m, (install according to the drawings), ensure that the positions are longitudinally in a straight line, and at the same time horizontally aligned left and right. The installation distance shall be subject to the design requirements.
The ratio of glue is 1:0.7 glue A and glue B, and then add 15%-30% cement as a filler (the glue is not easy to mix too much at a time, enough for one person to glue 50-70 road studs). The colloid should be stirred evenly, and the color (hand electric drill with agitator) should be consistent. Each road stud needs about 40-50 grams of glue for bonding.